|
Matt reinstalled the fork sliders, the dampener rod bolts, bushings, seals, and the snap rings, and checked the spring preload by pushing down on the forks. This ensures that the Emulators are seated properly. Everything checked out, so he re-installed the fork legs one at a time. View Related Article
|
|