|
9. Back up top, the proper amount of fork oil was poured into the tubes and Kody and Tony installed the handlebar assembly with the Performance Machine controls and Avon rubber grips already installed. The bar was wired and the cables for the clutch, throttle, and brake had already been attached to the bar and just needed to be mated with their corresponding parts. View Related Article
|
|