Hot Bike Magazine Homepage Hot Bike
Facebook Click here to find out more!

89ci Evo Sporty - 89-inch Sportster

Big Jugs, Heads, and Cams

By Toph Bocchiaro, Photography by Toph Bocchiaro
89Ci Evo Sporty Engine

For the past several issues of HOT BIKE, we've taken you through the teardown and resurrection of an '86 Sportster. What basically left the Factory in September 1985 as one of the first Evo-883-powered bikes later morphed into a run-of-the-mill 1,200 that culminated in a high-performance hemi-head 1,200 with high-compression domed pistons and Andrews cams, carb, pipes, and ignition. That last arrangement lasted all of 4,000 miles before a valve seat left its home to wreak havoc on the heads and valvetrain.

After letting it sit for a while, we decided to resuscitate the Sporty with top-notch components-all with performance in mind. That led to the other big Wisconsin purveyor of V-Twins and go-fast parts: S&S Cycle. The company had just what we were looking for to increase the potential of the venerable four-speed-in a kit, so to speak. Instead of having to piece together parts from different manufacturers, S&S had collections of parts that have been proven and tested to work well together. The company has it all, from mild to wild.

We decided on the S&S 89XLSS Sidewinder/Stroker Hot Set-Up kit, which turns any Evo Sporty into an 89ci (~1,458cc) monster. In our Vol. 39, No. 3 issue, we highlighted all of the parts we'll be using-generally speaking, a flywheel assembly with rods, oil-pump drive and pinion gears, pistons, cylinders, cams, pushrods, roller rockers, rocker boxes, and carburetor. Some case machining was required, as well as frame clearancing for the rear rocker box. Frame mods may or may not be needed, depending on what year you have.

In our last issue, we took you through the assembly of the lower end and various case bearings. We revisited Bennett's Performace in Signal Hill, CA, where motor builder to the stars Eric Bennett took us through the reassembly of the valvetrain and top end of the motor.

  • 89Ci Evo Sporty Pump Assembly
    1. After placing a gasket over the oil pump, the pump assembly was slid through the right case into the cam chest and secured with four fasteners.
    89Ci Evo Sporty Pump Assembly
    1. After placing a gasket over the oil pump, the pump assembly was slid through the right
  • 89Ci Evo Sporty Oil Pump Gear
    2. The S&S oil-pump gear, followed by the pinion gear, was slid over the pinion shaft, then secured with a locktab and red-loctited nut. Eric then installed the four Torrington cam bearings into the case.
    89Ci Evo Sporty Oil Pump Gear
    2. The S&S oil-pump gear, followed by the pinion gear, was slid over the pinion shaft, the
  • 89Ci Evo Sporty Cam Gears
    3. Four S&S 555 (Andrews V9) cams were slid through the two cam gear plates and into the bearings. Cams were aligned with the help of stamped dots (colored here for visualization) located on the outer cam surface and with the pinion-gear timing mark. The cam cover gasket was put on...
    89Ci Evo Sporty Cam Gears
    3. Four S&S 555 (Andrews V9) cams were slid through the two cam gear plates and into the b
  • 89Ci Evo Sporty Cam Cover
    4. ...followed by the cam cover and snugged up. This was a dry run to check cam endplay. Minimum endplay spec is 0.005 inch. After checking out, the cam cover was removed.
    89Ci Evo Sporty Cam Cover
    4. ...followed by the cam cover and snugged up. This was a dry run to check cam endplay. M
  • 89Ci Evo Sporty Cam Gears
    5. Eric liberally coated the cam gears, shafts, and bearings with ARP moly-based assembly lube. If the motor isn't going to be started immediately, it's a good idea to use an assembly lube that's going to stay put and isn't going to drip off the parts.
    89Ci Evo Sporty Cam Gears
    5. Eric liberally coated the cam gears, shafts, and bearings with ARP moly-based assembly
  • 89Ci Evo Sporty Cam Cover
    6. After reinstalling the cam cover, a new seal and the ignition trigger rotor and ignition sensor were installed.
    89Ci Evo Sporty Cam Cover
    6. After reinstalling the cam cover, a new seal and the ignition trigger rotor and ignitio
  • 89Ci Evo Sporty Blocks
    7. Next, the JIMS lifters were placed inside the lifter blocks and the blocks mated to the engine case.
    89Ci Evo Sporty Blocks
    7. Next, the JIMS lifters were placed inside the lifter blocks and the blocks mated to the
  • 89Ci Evo Sporty Cylinder Studs
    8. A set of Screamin' Eagle high-performance cylinder studs was then installed. These studs have threadlocker already installed on the case end that is activated by frictional heat. Eric threaded a head bolt onto the studs to aid in screwing the studs into the case.
    89Ci Evo Sporty Cylinder Studs
    8. A set of Screamin' Eagle high-performance cylinder studs was then installed. These stud
  • 89Ci Evo Sporty Stud
    9. Each stud was installed and measured to a height of 4.84 (+/- .05) inches from case to top of stud.
    89Ci Evo Sporty Stud
    9. Each stud was installed and measured to a height of 4.84 (+/- .05) inches from case to
By Toph Bocchiaro
Enjoyed this Post? Subscribe to our RSS Feed, or use your favorite social media to recommend us to friends and colleagues!

*Please enter your username

*Please enter your password

*Please enter your comments
Comments:
Not Registered?Signup Here
(1024 character limit)
Hot Bike