Hot Bike Magazine Homepage Hot Bike
Get Adobe Flash player
 

R&R Cycles In-house Big-incher

Follow along as R&R cycles builds a 147ci monster motor!
0402Hb Rrcycles27 Z

0402Hb Rrcycles01 Z
Every R&R motor starts off... 
   
  read full caption
0402Hb Rrcycles01 Z
Every R&R motor starts off as a solid block of billet aluminum. The cam side is cut from a 110-pound piece, and the sprocket side started life as a 60-pounder.
0402Hb Rrcycles02 Z
After about two hours of machining,... 
   
  read full caption
0402Hb Rrcycles02 Z
After about two hours of machining, you can see the cases take shape.
0402Hb Rrcycles03 Z
External oil drains are machined... 
   
  read full caption
0402Hb Rrcycles03 Z
External oil drains are machined into every case along with a design for short, high-strength base bolts. Note the case has a bigger cam housing. This allows more oil to be in the lower end, and lowers breather misting due to high case pressure. It also helps the rear cylinder stay cooler with more oil flow.
0402Hb Rrcycles04 Z
To ensure precise accuracy... 
   
  read full caption
0402Hb Rrcycles04 Z
To ensure precise accuracy of each critical area and component, this Zeiss inspector dynamically monitors tool wear and all tolerance in the cases.
0402Hb Rrcycles05 Z
This is what the sprocket... 
   
  read full caption
0402Hb Rrcycles05 Z
This is what the sprocket side looks like once it's milled down. Now the two halves will stay together as a set until it is time for final assembly.
0402Hb Rrcycles06 Z
With the cases bolted together,... 
   
  read full caption
0402Hb Rrcycles06 Z
With the cases bolted together, the races will be line-bored which guarantees true, concentric alignment from the cam side to the sprocket side.
0402Hb Rrcycles07 Z
Milling the oil passages,... 
   
  read full caption
0402Hb Rrcycles07 Z
Milling the oil passages, lifter bores, spigot, oil pump, and motor mount holes comes next. Once again, the Zeiss inspecting is done throughout the entire process.
0402Hb Rrcycles08 Z
The cylinders are next. Each... 
   
  read full caption
0402Hb Rrcycles08 Z
The cylinders are next. Each one starts as a block of billet aluminum. Big-inch motors need to be manufactured with a tighter tolerance, and the R&R team has done just that.
0402Hb Rrcycles09 Z
After the outer shape is cut... 
   
  read full caption
0402Hb Rrcycles09 Z
After the outer shape is cut and the initial center bore finished, the fins are machined. The R&R cylinders feature fins which are extremely deep around the entire diameter. Since the oil lines are external, R&R uses base bolts, not cylinder studs, so they don't lose a substantial amount of fin area.
0402Hb Rrcycles10 Z
Each cylinder is honed on... 
   
  read full caption
0402Hb Rrcycles10 Z
Each cylinder is honed on an automated cylinder hone using diamond tooling and a water-soluble coolant allowing R&R to make just one cut to proper sleeve size.
0402Hb Rrcycles11 Z
With the cylinders machined... 
   
  read full caption
0402Hb Rrcycles11 Z
With the cylinders machined to a tolerance of less then 0.002 inch, they are heated enough to let the sleeves slide into place.
0402Hb Rrcycles12 Z
Each head starts off as a... 
   
  read full caption
0402Hb Rrcycles12 Z
Each head starts off as a 36-pound piece of billet aluminum. Things start by machining the rocker-box surfaces, the combustion chamber, and the head gasket surface.
0402Hb Rrcycles13 Z
Here are the heads before... 
   
  read full caption
0402Hb Rrcycles13 Z
Here are the heads before the ports are cut in.
0402Hb Rrcycles14 Z
Next, the CNC heads are sent... 
   
  read full caption
0402Hb Rrcycles14 Z
Next, the CNC heads are sent to the 5-Axis machining center. All ports and combustion chambers are completed here. Each head is designed for a particular engine application. This machine will ensure they cut all the ports the same size and the angle of flow will be consistent.
0402Hb Rrcycles15 Z
After the heads are all machined,... 
   
  read full caption
0402Hb Rrcycles15 Z
After the heads are all machined, the valve seats are installed in the heads with a guide and a hammer.
0402Hb Rrcycles16 Z
Next, the heads are sent to... 
   
  read full caption
0402Hb Rrcycles16 Z
Next, the heads are sent to the flow bench where each port goes through cross sectional flow analysis. Every head goes through rigorous testing before it's bolted to a motor.
0402Hb Rrcycles17 Z
The rocker boxes are made... 
   
  read full caption
0402Hb Rrcycles17 Z
The rocker boxes are made from billet aluminum. R&R rocker boxes are made with perches where the rocker shafts are offset to accommodate the taller cams.
0402Hb Rrcycles18 Z
The connecting rods are purchased... 
   
  read full caption
0402Hb Rrcycles18 Z
The connecting rods are purchased with undersized bores. Then R&R sizes each set of connecting rod bores to each crankpin with the bearing as a set. The rods are then installed into the pin-boring machine where the piston pin end of the rod is bored. This also reduces side-loads on the flywheel thrust washer and the sides of the cylinder liner.
0402Hb Rrcycles19 Z
Flywheels are machined from... 
   
  read full caption
0402Hb Rrcycles19 Z
Flywheels are machined from blanks but are made as a matched set to ensure consistency. R&R also puts in large pinion tapers to ensure the integrity of the assembled flywheels.
0402Hb Rrcycles20 Z
All machined parts are inspected... 
   
  read full caption
0402Hb Rrcycles20 Z
All machined parts are inspected by a coordinate measuring machine (CMM). The CMM is used for both in-process and final inspection. All critical dimensions are validated on this piece of equipment before the parts are sent to the assembly room
0402Hb Rrcycles21 Z
Each flywheel is weighed and... 
   
  read full caption
0402Hb Rrcycles21 Z
Each flywheel is weighed and balanced by drilling a series of holes to counterbalance the center weight so in any position the flywheel will not rotate on the balancer.
0402Hb Rrcycles22 Z
The pinion shaft and sprocket... 
   
  read full caption
0402Hb Rrcycles22 Z
The pinion shaft and sprocket shaft are installed on each wheel then torqued down. Next, the crank pin was installed, rod endplay measured, and the female rod was ground for perfect rod side play. The crank pin nuts were torqued to 500 lb-ft and trued to within 0.0005 inch or less on each side.
0402Hb Rrcycles23 Z
Crank endplay is set in the... 
   
  read full caption
0402Hb Rrcycles23 Z
Crank endplay is set in the left side of the case. However, instead of the standard pinion-style roller bearing in the right half, a Timken bearing is used along with an aircraft-quality ball bearing.
0402Hb Rrcycles24 Z
Final crank endplay is then... 
   
  read full caption
0402Hb Rrcycles24 Z
Final crank endplay is then set between the two case halves. Once the endplay has been set, the two halves are disassembled and the ball bearing is installed. The crank is installed in the crankcase. R&R takes the extra steps to help reduce flywheel flex and vibration.
0402Hb Rrcycles25 Z
The pistons are installed... 
   
  read full caption
0402Hb Rrcycles25 Z
The pistons are installed on the rods and the wristpins are held in place with Teflon buttons so there is no chance of a pin clip working its way out. Then, the base gaskets are installed and the cylinders are slid into place. The base bolts are torqued to 40 lb-ft.
0402Hb Rrcycles26 Z
The heads are pre-assembled... 
   
  read full caption
0402Hb Rrcycles26 Z
The heads are pre-assembled and the valve stem seals are installed. Next, the spring pack is set and checked for valve travel. Each head is tested to ensure both the front and rear heads have the same compression, then they are bolted to the motor. Forged roller rocker arms are put into place with adjustable pushrods, then the rocker boxes are installed. The last things to go on are the Dyna 2000 ignition and the S&S (D) carburetor.
0402Hb Rrcycles27 Z
Finally, each motor is secured... 
   
  read full caption
0402Hb Rrcycles27 Z
Finally, each motor is secured to a stand then crated to be shipped out or installed in a bike.

Honda Accord Research
Honda Accord Read detailed reviews on the all new Honda Accord and compare it with other vehicles you may be thinking of buying. The 2010 Accord has fuel economy of 26 mpg, and can seat 5 people comfortably. You may also be interested in the BMW M6 and the Honda Fit.

Related Articles

 
2000 Southern Metal Choppers Custom - Orange Curse
Southern Metal Choppers Rigid Buell... more
 
Motorcycle Product Pics
Airea paint job and more... more
 
 
Inside The Motorcycle Industry
Read news about Bruce Rossmeyer's tragic motorcycle death and more.... more
 
Motorcycle Product Pics
New Stuff In The Hot Bike Office... more
 
ThunderMax for TBW H-D Bikes
Testing at Delmarva Bike Week and Daytona Biketoberfest.... more
 
 
Readers' Motorcycle Submissions
Readers' Showcase... more
 
New Z-Plus Motorcycle Brake Pads from Lyndall Racing Brakes
Motorcycle Brake Service And Inspection... more
 
Motorcycle Suspension Buyer's Guide
Burly Slammer Kit and more... more