|
Once all of the tubing has been cut, bent, and prepped with the mounts and brackets machined, it's time to load the frame jig with the parts. The jig is precision-built from heavy steel in order to accurately hold and locate all the parts so they can be welded. This jig is partially loaded with components. View Related Article
|
|